1. 跳转至内容
  2. 跳转至主菜单
  3. 跳转到更多DW网站

中国重启核电建设

2012年10月25日

由于日本核灾难而一度暂时叫停的中国核电发展计划如今恢复启动,国务院新发布的核电发展规划决定,提高准入门槛,且在十二五期间不审批内陆项目。

https://p.dw.com/p/16W6i
The dome of the containment structure for the No.1 reactor is being hoisted at the contruction site of the Changjiang Nuclear Power Plant in Tangxing village, Haiwei Township, Changjiang Li Autonomous County, south Chinas Hainan province, 28 December 2011. The dome of the containment structure for the No.1 reactor at the Changjiang Nuclear Power Plant was topped out on Wednesday (28 December 2011) in south Chinas Hainan province. The plant will be built in two phases, both consisting of two CNP-600 pressurized water reactors, with a capacity of 650 megawatts each. With a total investment of 20 billion yuan (US$3.16 billion) for Phase I, the first unit is scheduled to be operational by 2014 and second unit by 2015. More than 70% of the equipment will be indigenous made. Schlagworte Atomkraft, Energie, China
China Atomkraftwerk Baustelle Tangxing图像来源: picture-alliance/dpa

(德国之声中文网)中国国务院周三召开的常务会议讨论通过了到2020年的核电安全规划以及核电中长期发展规划。其中主要内容是:逐步恢复正常建设,但在"十二五"期间不安排内陆核电项目,并且要提高准入门槛。

据法新社援引中国政府官方消息报道,在2015年之前,会审批通过"少量"沿海地区核电项目。鉴于去年3月份日本发生的核灾难,中国政府曾一度叫停核电项目的审批工作,如今重新恢复发展,等于对这一战略进行了谨慎的修正。不过,为了打消人们对于核电安全的顾虑,国务院表示,新审批的核电站将全部采用"第三代"核电安全标准进行建设。

Chi2510 China AKW - MP3-Mono

三个内陆项目搁浅 前期投资打水漂

与此同时,暂停内陆核电项目审批的决定应该会影响到三家筹划中的内陆核电项目,它们分别是江西彭泽、湖南桃花江以及湖北大畈。这三个项目已经进行了巨额的前期投资,原本只待一纸批文即可开工建设,如今遭遇搁浅之后将如何善后处理,仍然存在疑问。

今年2月,彭泽核电项目遭到了来自邻近省份安徽的强烈抗议,原因是在地震带区域建设核电站,将会对附近的居民安全造成严重威胁。根据世界核协会(World Nuclear Association)的统计,中国拥有雄心勃勃的核电发展计划,目前正在运营的商业性核电站一共有15座,而目前在沿海地区还有27个核电项目正在兴建过程中。

核电安全能否得到有效监管?

Japan Neustart der Kernreaktoren
福岛核灾难对全世界来说都是一场噩梦图像来源: dapd

根据周三召开的国务院常务会议所作出的决定,中国将到2015年的核电发展目标从原来的装机总容量达到5000万千瓦,下调为4000万千瓦。在会上发布的这一最新发展规划强调,中国从未遭遇严重的核事故,有关部门也实施了"全面的安全监管",这显示"中国的核电安全是可以得到保障的"。

自从2011年日本福岛核电站发生核泄漏事故之后,全球对于核电安全的担忧剧增。中国环保部在本月发布的一份报告中称,本国的核电安全情况"不容乐观",并指出由于各核电站采用的反应堆类型不同,导致整个行业"难以管理"。

来源:法新社 编译:雨涵

责编:洪沙